Hi,
we are trying to run AC 5.3 Centralized provisioning Initial load job in SAP IdM to provision Risk analysis for Non-SAP Application roles. we have all non-sap roles and applications into GRC, we have also connected VDS-IDM framework and it is working, but when we are trying to run the initial load job, the job running without error but the pass - Get Applications From VDS is fetching only SAP roles.
if any idea please suggest.
Regards,
Kishor Kajale
SAP IDAM Consultant
9673691740